Confirm the reject
Where an automatic reject is used, confirm that the selected bottle was removed and that the reject container cannot return to production unnoticed.
Define how the line will confirm that the rinse stage has achieved its agreed purpose before bottles enter filling.
A post-rinse inspection can range from a documented manual sample check to an automated empty-bottle inspection system. The appropriate method depends on what must be detected, the bottle material and colour, the neck and base geometry, production speed, the consequence of a missed defect and the user's quality system. A clear glass bottle under controlled lighting is a different inspection task from an opaque HDPE container or a deeply shouldered bottle.
The inspection plan should separate the ability to see a condition from the ability to remove the affected bottle. A camera or operator may identify a problem, but the line must also have a controlled stop, reject or quarantine response. The status of bottles held between the rinser and filler after a fault must be defined so that unverified containers are not released by accident.
Where an automatic reject is used, confirm that the selected bottle was removed and that the reject container cannot return to production unnoticed.
Define the maximum number of bottles between the rinse/inspection decision and the filler so the affected batch can be contained after a fault.
Record format, settings, inspection result, alarm and intervention information at the level required by the user's quality system.
Define what the inspection is expected to find and the consequence of a miss.
Plan bottle status, stop/reject behaviour and fault recovery.
Review inspection, conveying and filler handover as a complete sequence.
The most useful enquiry states what must be found, how bottles are presented, the line rate and what should happen after a failed check.